WeSprayIt — You Say It, We Spray It

WeSprayIt field guide

Planning spray work in a commercial building

Documents, access, protection and trade sequencing to gather before requesting a commercial quote.

Bring the project documents

Relevant drawings, specifications and assembly details help distinguish thermal insulation, acoustic treatment and fireproofing requirements. Include the approximate area and substrate where possible.

Map access and constraints

Note ceiling height, lift access, loading or parking restrictions, occupied zones, sensitive equipment and areas requiring protection. These details can change how a project is staged.

Coordinate the schedule

Spray work may need to follow substrate preparation and precede other finishes. Identify other trades, inspection milestones and the realistic work window at the start of the conversation.