What to document before a quote
Photos of the access hatch, roof slopes, framing bays and existing insulation provide a useful starting point. Note any mechanical equipment, wiring, storage or areas that are difficult to reach.

Roofline + attic work
Assessment-led spray insulation for open attics, roof slopes and difficult roof assemblies.

The application
Attics can differ in roof shape, existing insulation, ventilation and access. WeSprayIt reviews the visible assembly and project goal before discussing a spray-applied approach. Existing moisture or roof issues should be addressed as part of the wider project plan.
Photos of the access hatch, roof slopes, framing bays and existing insulation provide a useful starting point. Note any mechanical equipment, wiring, storage or areas that are difficult to reach.
Changing an attic insulation approach can affect how the assembly manages air and moisture. The proposed work needs to account for the actual roof and ventilation configuration rather than relying on a one-size-fits-all detail.
Building type, substrate, access and project requirements determine the appropriate application. Send those details with your quote request.
Have a project in mind?
Share the location, assembly and practical project details. We’ll start with the right questions.
Request a quote