Preparation defines the scope
Chalking, peeling, cracks, corrosion and old coatings require different responses. Separate washing, scraping, sanding, repairs, priming and finish coats by surface.

Priority 03 · façades + elevations
Exterior repainting for commercial and strata properties, organized around preparation, access, weather and building operations.

Scope planning
A sound exterior scope starts with the actual substrate. We review access, preparation needs, failed coatings, sealant interfaces, adjacent finishes and how the property remains usable.
Chalking, peeling, cracks, corrosion and old coatings require different responses. Separate washing, scraping, sanding, repairs, priming and finish coats by surface.
The work plan considers lift or boom access, equipment routes, masking, nearby inventory, ventilation and the limits of the active zone.
Occupied properties and active sites may need evening, weekend or phased work. Define shutdowns, inspections, tenant communication and hand-offs before setting the sequence.
Send the building type, city, drawings or specifications, substrate, approximate area, access height, occupancy, desired timing and photographs.
Commercial, strata or repair scope?
Share the location, substrate or assembly, area, access, timing and photographs.